Skip to content
ArivuஅறிவுArivu

Cluster · Krishnagiri district

Hosur ஓசூர்

Electronics, two-wheelers and electric vehicles, in the Bengaluru shadow.

Firms

612

as at 31 Jul 2026 · source: MCA GODL layer; Arivu curation

Employed

1,84,000

as at 30 Jun 2026 · source: DES; establishment filings

Output

₹58,400 crore

as at 31 Mar 2026 · source: DES Annual Survey (structured)

Announced since 2021

₹94,200 crore

as at 31 Jul 2026 · source: Guidance releases; company filings

Realised

34%

as at 31 Jul 2026 · source: Arivu realisation tracker

What this cluster makes

Hosur sits forty kilometres from Bengaluru's airport and pays Tamil Nadu wages. That arithmetic built a belt of two-wheeler and electronics assembly along the Krishnagiri corridor, and it is now the state's centre of gravity for electric-vehicle manufacture. The cluster's advantage is proximity without the Karnataka cost base; its exposure is that the same proximity makes Bengaluru, not Chennai, the labour market it competes in.

Output, ₹'000 crore

Unit: ₹'000 cr

202120222023202420252026

The firm table

Named firms — the whole point

No government site in the estate publishes one. Illustrative register; each row tagged and dated.

FirmCINSectorSizeStatusVerified
Kaveri Precision ComponentsU29309TN2011PTC084521Auto componentsMediumActiveC18 Jul 2026
Hosur EV SystemsU34100TN2019PLC126004Electric vehiclesLargeActiveC2 Aug 2026
Nilgiri Battery WorksU31401TN2021PTC141220Energy storageSmallActiveC28 Jun 2026
Krishnagiri ToolroomU28910TN2008PTC067114Precision engineeringSmallActiveC11 May 2026
Denkanikottai PolymersU25209TN2014PTC098340PolymersMicroDormantC19 Mar 2026
Search the full register →

Facilities and land

SIPCOT parks and availability

ParkOperatorDevelopedVacant
SIPCOT Hosur Phase IISIPCOT1,240 ac6%
SIPCOT Hosur Phase ISIPCOT860 ac2%
Nanjangud–Hosur electronics parkSIPCOT410 ac28%

Source: SIPCOT; illustrative · [C]

The commitment pipeline

Announced against realised

1 · Announced

₹16,700 crore
2 · 100%

2 · Land

₹16,700 crore
2 · 100%

3 · Clearance

₹16,700 crore
2 · 100%

4 · Commissioning

₹12,500 crore
1 · 75%

5 · Jobs

₹12,500 crore
1 · 75%

Value shown is announced ₹, narrowing as commitments progress. The announced-to-deployed discount is 60–80% C and is applied to every headline figure on this platform.

Workforce and skills

ITIs at Hosur and Krishnagiri supply assembly-line intake; the gap is in battery-systems and power-electronics technicians, currently drawn from Bengaluru at a wage premium.

The constraint

Water is the binding constraint: the cluster draws on the Kelavarapalli reservoir and competes with Bengaluru's periphery for the same catchment. Time-to-clearance for a new large facility is faster than the state median, but power reliability in Phase II peaks below assured load in the pre-monsoon months.

This is the section a promotion agency cannot write. An evidence institution must — and that asymmetry is the entire licence to operate.

Method and sources

Every figure on this page carries its own confidence tag and as-at date. Firm counts derive from the MCA GODL layer with Arivu curation; output and employment are structured from the DES Annual Survey; commitments are traced from public releases and company filings, with the 60–80% announced-to-deployed discount applied. All figures on this preview are illustrative.

Announced to date: ₹16,700 crore across 2 tracked commitments.